In the 1990s, the US Navy found itself at a loose end, as the missions that had defined the late Cold War faded in importance and it reoriented itself towards land attack. The main result was a new destroyer, designed primarily to provide fire support for troops ashore, but with some multi-mission capability. Unfortunately, they decided that this class would be truly stealthy, which drove up size and trapped the ships in a spiral of increasing cost and falling numbers, with a 32-ship program being cut to only three ships by 2008, and coming close to being shut down in 2010 thanks to the resulting cost increases.

USS Michael Monsoor
The first ship, USS Zumwalt (DDG-1000)1 was ordered in 2008, and followed by Michael Monsoor, named for a SEAL killed in Iraq, and Lyndon B Johnson, named for an obscure naval officer who served briefly in WWII. The three ships were laid down in 2011, 2013 and 2017 respectively, but the start of construction did little to slow the cost growth, as the combined procurement cost of the three ships rose from $9 billion in FY09 to $13.3 billion in FY21, not counting R&D costs of something like $10 billion.2 The program's weirdness continued as the ships neared completion. Instead of integrating the weapons and then accepting and commissioning the ships, the first two units were officially commissioned in 2016 and 2019, and then sent to San Diego for weapons integration. Zumwalt finally completed this process in 2020, although initial operational capability has continued to slide, and there doesn't even seem to be a specific number available as of July 2026. Read more...








Recent Comments